Enquiry for space frames mfrs & suppliers
Category
SPACE FRAMES MFRS & SUPPLIERS
Requirements
1. Space frame for roof canopy of (existing mall entrance canopy)
2. Design (and approval for design), Supply, fabrication, erection , on site.
3. To fix on existing concrete columns by suitable method .
4. Schematic sketches attached, to Be developed by supplier based on this scheme, (workshops with Architect can be arranged on site if required).
5. Roof sandwich panel (to be included in scope)
6. Aluminum composite panel for “edge cladding”, and ceiling below, by others.
7. Space frame supplier to Coordinate with main contractor for site coordination, access etc.
8. Time period, minimum feasible (max four months is clients expectation).
Should you be interested, Concept sketches shall be e-mailed to you.
Best Regards
Anil B Nair (Deputy Manager - QS)
Posted on
04 Dec 2016 8 years ago
Recurring Requirement Every 255 Days
Buyer Details (Be An Elite Member To View Buyer Details)
Company Name
Al *******************
Address
Ras Al Khaimah UAE