Enquery for CP material.
Requirements
1. Transformer rectifier –Dual channel output 2x 25v,3A,oil cooled,400v, 3 phase with sunshade : 2 nos.
2. Mixed Metal oxide coated Titanium Ribbon Anode: 600 meters
3. Titanium conductor bar: 200 meters
4. ER-Soil corrosion Probe ( For monitoring corrosion under the tank bottom): 2 Nos.
5. Test stations-CAPTAIN type: 2 Nos.
6. Perforated PVC pipe3 inch wrapped with Geo-textiles: 24 meters
7. Anode JB, UV RESISTENT, with current measuring shunt IP-55: 2 Nos.
8. Titanium conductor bar with factory pre-fabricated Tail cable (1cx 25 mm2 - 60 meter long in each) : 6 Nos.
9. Cable ,1c x 50mm2 ( 0.6/1 KV ,Annealed Standard Copper wire Double insulated XLPE/PVC): 500 Meters
10. Cable, 1CX 10 mm2 ( 0.6/1KV ,Annealed standard Copper wire Double insulated XLPE/PVC): 150 Meters
11. Cable, 1CX 25 mm2 ( 0.6 / 1KV ,Annealed standard Copper wire Double insulated XLPE/PVC): 400 meters.