Enquiry For Steam Trace
Category
STEAM TRACE
Requirements
The following materials are required for steam tracing (tubing):
• 2 converters from 3/4" pipe to OD 20mm tubing
• 2 couplings 20mm
• 2 meters banding
• 8 meter OD 20mm x Wall.THK min. 1,65mm SS316 tubing.
Kindly advise the price and availability of the same as early as possible.
Posted on
16 Oct 2019 5 years ago
Buyer Details (Be An Elite Member To View Buyer Details)
Company Name
MME*******************
Address
Abu Dhabi United Arab Emirates